{"id":8191,"date":"2015-06-02T14:07:32","date_gmt":"2015-06-02T18:07:32","guid":{"rendered":"https:\/\/sourcelive.wordpress.com\/?p=8191"},"modified":"2025-12-17T09:26:12","modified_gmt":"2025-12-17T14:26:12","slug":"avoid-construction-this-summer","status":"publish","type":"post","link":"https:\/\/sourcelive.hr.msu.edu\/?p=8191","title":{"rendered":"Navigate construction this summer"},"content":{"rendered":"<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">Summer calls for barbecues, beach days, camping and, of course, construction.\u00a0Read on to find out where roadwork is taking place in and around campus.<\/span><\/p>\n<p style=\"line-height: 18pt;\"><a title=\"MSU construction\" href=\"http:\/\/ipf.msu.edu\/construction\/projects\/north-campus-infrastructure-improvements-2015.html\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"font-family: 'Georgia', 'serif';\">MSU<\/span><\/a><\/p>\n<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">The construction that began on the southern half of West Circle Drive on May 11, which will continue until about July 12, has closed the stretch of road from the Spartan statue entrance to just past Main Library. \u00a0Lots 11 and 6 are also closed, which means the surrounding lots and ramps fill up quickly.\u00a0Check out the detour\u00a0<\/span><a title=\"West Circle Drive construction detour\" href=\"http:\/\/ipf.msu.edu\/construction\/detours\/detour-map.html\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"font-family: 'Georgia', 'serif';\">here<\/span><\/a><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">.<\/span><\/p>\n<figure id=\"attachment_8219\" aria-describedby=\"caption-attachment-8219\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/i0.wp.com\/sourcelive.hr.msu.edu\/wp-content\/uploads\/2015\/06\/msu-contruction.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-8219\" style=\"filter: invert(0);\" src=\"https:\/\/i0.wp.com\/sourcelive.hr.msu.edu\/wp-content\/uploads\/2015\/06\/msu-contruction.jpg?resize=300%2C200\" alt=\"West Circle Drive construction\" width=\"300\" height=\"200\" srcset=\"https:\/\/i0.wp.com\/sourcelive.hr.msu.edu\/wp-content\/uploads\/2015\/06\/msu-contruction.jpg?w=576&amp;ssl=1 576w, https:\/\/i0.wp.com\/sourcelive.hr.msu.edu\/wp-content\/uploads\/2015\/06\/msu-contruction.jpg?resize=300%2C200&amp;ssl=1 300w\" sizes=\"(max-width: 300px) 100vw, 300px\" data-recalc-dims=\"1\" \/><\/a><figcaption id=\"caption-attachment-8219\" class=\"wp-caption-text\">Work continues on the West Circle Drive construction site.<\/figcaption><\/figure>\n<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">After July 12 one lane will be opened until Aug. 15, when construction is completed. Lot 6 and part of Lot 11 will also reopen. The summer project will upgrade steam tunnels, the water main and the telecommunication and electrical lines, among other improvements.<\/span><\/p>\n<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">In addition, the length of Chestnut Road between Wilson Road and Trowbridge Road will be closed for construction from June 1 to July 24. Drivers can detour on nearby Red Cedar or Birch roads.<\/span><\/p>\n<p style=\"line-height: 18pt;\"><a title=\"East Lansing construction\" href=\"http:\/\/www.cityofeastlansing.com\/CivicAlerts.aspx?AID=145\" target=\"_blank\" rel=\"noopener noreferrer\"><span style=\"font-family: 'Georgia', 'serif';\">East Lansing<\/span><\/a><\/p>\n<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">The city of East Lansing closed the length of Bogue Street from Grand River Avenue to Shaw Lane for construction on May 11 as well. A detour will be posted until its approximate scheduled reopening, June 12.<\/span><\/p>\n<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">Following this project, Abbot Road between Burcham Drive and Saginaw Street will undergo construction. Fortunately, much of the work will take place at night, but for one week the road between Saginaw Street and Whitehills Drive will be completely closed to replace a cross section. The entire project is estimated to end Aug. 14.<\/span><\/p>\n<p style=\"line-height: 18pt;\"><span style=\"font-family: 'Georgia', 'serif'; color: #333333;\">Some smaller projects include asphalt paving on Virginia Avenue between Burcham Drive and Snyder Road and sidewalk ramp improvements on Grove Street between Burcham Drive and Linden Street.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Summer calls for barbecues, beach days, camping and, of course, construction.\u00a0Read on to find out where roadwork is taking place in and around campus. MSU The construction that began on the southern half of West&hellip; <a class=\"continue\" href=\"https:\/\/sourcelive.hr.msu.edu\/?p=8191\">Continue Reading&#8230;<span> Navigate construction this summer<\/span><\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"__cvm_playback_settings":[],"__cvm_video_id":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0},"categories":[9],"tags":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pb1fcA-287","_links":{"self":[{"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=\/wp\/v2\/posts\/8191"}],"collection":[{"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8191"}],"version-history":[{"count":4,"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=\/wp\/v2\/posts\/8191\/revisions"}],"predecessor-version":[{"id":19714,"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=\/wp\/v2\/posts\/8191\/revisions\/19714"}],"wp:attachment":[{"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcelive.hr.msu.edu\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}